GE Vernova
Scores out of 100 · Ranks within the 50-company cohort
Target date 2026-11-09
Target date 2027-09-18
Target date 2030-09-18
Our power thesis
Current Energy rises to 95 for scarce delivery slots and installed service capability. Orders are not operating generation. Trench remains excluded from current ownership and the forecast does not require its completion.
Four Forces breakdown
Each force uses the same fixed 0–100 scale. The strongest force and breadth of control determine the Power Score.
| Force | 2026 | 2027 | 2030 |
|---|---|---|---|
| Compute | 5 | 5 | 5 |
| Interface | 15 | 20 | 20 |
| Alignment | 10 | 10 | 15 |
| Energy | 95 | 95 | 95 |
Our forecast
Across our 2026–2030 view, the Power Score rises from 63.1 to 64.4; the rank moves from #30 to #40.
Interface 15 → 20; Alignment 10 → 15.
The thesis above explains our call. Rank can fall even when power grows if other companies gain faster.
What would change our mind
Project delays prevent equipment demand from becoming energized capacity.
Research behind the judgment
GE Vernova reports gas-equipment backlog and slot reservations of 122 GW and growing power and grid equipment demand. The Trench acquisition is expected to close in late 2027.
- GE Vernova Q3 2026 results and transaction status2026-10-28 · Accessed 2026-11-09
Sources inform the factual premises. Force scores, ranks, and forecasts are exmxc’s judgments as of this edition.